Project Information:

The project is located in the Village of East Montpelier, Vermont, which is both a residential area and a historic district. The Project design has been advanced to approximately 30% completion stage.

This project includes, but is not limited to:

  • Replacement of the existing Bridge 68 that carries VT 14 over the Winooski River.
  • Improvements to US Route 2/ VT 14 Intersection including:
    • Removal of existing rigid concrete pavement from the road base of VT14 and US 2 within the project limits;
    • Full Depth Reconstruction of US2 and VT 14 with widening of the approaches to accommodate turning lanes;
    • Intersection Signals;
    • Providing a New Sidewalk on US 2;
    • Providing Conduit for the future undergrounding of Utilities in the vicinity of the intersection.