Hartford IM 091-2 (79)

Point of Contact:

Molly Perrigo

Hartford IM 091-2 (79)

BIDS OPENED ON: DECEMBER 17, 2014

Contractor Bid Amount As Read: Bid Amount Confirmed:
PCL Civil Constructors, Inc. $11,132,592.66 $11,132,592.66

Short Listed Firms announced: (November 13, 2013)

PCL Civil Constructors, Inc.

Cianbro Corporation

 

 

RFP Change #2: (September 27, 2013)

RFP Change number two was posted to the FTP Site.

RFP Change #1: (September 9, 2013)

RFP Change number one was posted to the FTP Site.

RFP Release: (August 23, 2013)

The RFP has been released. It is now available on the VTrans FTP system. Proposals are due October 11, 2013 by 1:00 p.m.

The New York State DOT I-84 over Dingle Ridge Road Bridge Replacement Project utilizes Slide-In Bridge Construction techniques along with the SHRP2 R04 Innovative Bridge Designs for Rapid Renewal toolkit to minimize traffic impacts during construction. Additional information about the project can be found at:
 
 
Please be advised this link is being provided for informational purposes only.
 
 
 
To access the PDF of the Power Point Presentation from the Informational Meeting:
Project Information:

This project is located in Hartford, VT and includes replacement of two bridges on I-91 just north of the Exit 11 interchange. The bridges are:

  • Bridge 43N over US Route 5

  • Bridge 43S over US Route 5

This project includes, but is not limited to:

a) The new bridges will be constructed on temporary supports adjacent to the existing structures and will be moved into place once the existing bridges are removed.

b) I-91 will be closed at each bridge for a short duration while the existing bridge is removed and the new bridge is moved in place. The closure is expected to include one weekend for each bridge and will be completed during the summer of 2015.