South Burlington IM CULV(24)/Georgia IM CULV(24)

Point of Contact:

Molly Perrigo

July 17, 2015

RFP Change #1 was posted to the VTrans FTP Site.

March 27, 2015

RFP Release:

The RFP has been released. It is now available on the VTrans FTP system to the Short Listed Teams.

August 4, 2014

SHORT LIST POSTED:

Kubricky Construction Corp./Clough Harbour & Associates LLP

J.A. McDonald Inc./Stantec Consulting Services Inc.

June 19, 2014

RFQ Change #2 was posted to the VTrans FTP Site.

June 12, 2014

RFQ Change #1 was posted to the VTrans FTP Site.

May 15, 2014

The RFQ for this project was posted on the VTrans FTP Site.

The Project is located in South Burlington and Georgia, Vermont and includes four culverts underneath I-89 between exits 12 and 13 and two culverts underneath I-89 between exits 17 and 18. The buried structures are:

South Burlington:

  • Culvert 63-1N under I-89 northbound, located 1.7 miles north of Exit 12 at MM 85.67.
  • Culvert 63-1S under I-89 southbound, located 1.7 miles north of Exit 12 at MM 85.66.
  • Culvert 64-1N under I-89 northbound, located 0.9 miles south of Exit 13 at MM 86.76.
  • Culvert 64-1S under I-89 southbound, located 0.9 miles south of Exit 13 at MM 86.68.

Georgia:

  • Culvert 83-1N under I-89 northbound, located 1.1 miles south of Exit 18 at MM 105.37.
  • Culvert 83-1S under I-89 southbound, located 1.1 miles south of Exit 18 at MM 105.37

The Project includes, but is not limited to design and build:

    1. Complete replacement of culverts 63-1N, 63-1S, 64-1N, 64-1S, 83-1N and 83-1S with new buried structures;
    2. Maintaining streams and waterways;
    3. Maintenance of Traffic – Implementation of Smart Work Zone.
      1. South Burlington – Two lanes North and South
      2. Georgia – Two lanes South, one lane North during AM peak hours; Two lanes North, one lane South during PM peak hours.