23-4 Travel Time Delay Through Workzones

Project Dates: July 1, 2023 - June 30, 2024

Project Description: 

Although the Vermont Standard Specifications for Construction identify an acceptable delay of less than 10 minutes per operation and less than 15 minutes cumulatively for a project maintaining one-way traffic, it is recognized that these thresholds have been set without consideration for context, procedures for measuring delay, or methods for mitigating delay. Evaluating the work zone safety and mobility practices in Vermont, researching and right-sizing best practices from other state DOTs to apply in Vermont, and shepherding updated guidance to better serve the Agency are all important components of this effort. Previous work led by VHB identified strategies to manage, assess, and improve mobility and safety processes and procedures through work zones.

 

Poster:

 

Factsheet                    Presentation                    Other

 

Final Report                   Archived Documents

Related Symposium Page
2024 Symposium

2023 Symposium Lite

Researchers:
Karen Sentoff (VHB) and James Sullivan (UVM)

Champion(s)/TAC members:
Ben Tietze, Nancy Avery, Brian Sanderson, Ian Kilburn

Implementation:

 

**Posters, Fact Sheets, Presentation Recordings and Other Materials are prepared for our September Research and Innovation Symposium each year. This page includes the latest materials. Check back in September for updated materials related to this project.