The following is a list of construction projects that have dedicated personnel to help keep the public informed on the progress of projects, answer questions, and hear concerns. To receive weekly updates for a specific project, please contact the corresponding public information consultant and reference the project you'd like to follow.
*If you are a member of the media and want more information about a specific project, please reach out to Amy Tatko: amy.tatko@vermont.gov
Municipality | Project | Description | Public Info Consultant |
Belvidere | Belvidere STP CULV(77) | Culvert Replacement along VT Route 109 in Belvidere | Stephanie Barrett - sbarrett@coibsinc.com |
Bennington | Resurfacing of VT Route 279 in Bennington |
Marcy Miller - mmiller@fhistudio.com |
|
Bennington | BENNINGTON STP 1000(23) | Intersection improvement project at VT Route 67A, Matteson Road, Silk Road and College Drive | Elaine Ezerins - elaine.ezerins@wsp.com |
Bennington | Resurfacing of U.S. Route 7 in Bennington |
Marcy Miller - mmiller@fhistudio.com |
|
Bennington - Pownal | Resurfacing of U.S. Route 7 beginning at the Massachusetts/Vermont State border extending north to Bennington | Marcy Miller - mmiller@fhistudio.com | |
Berlin | Berlin STP SURF(83) | Resurfacing of Airport Road and Berlin State Highway | Bethany Oprendek - bethany@bbo-enterprises.com |
Berlin-Barre | Berlin-Barre STP SURF(75) | Resurfacing of Vermont Route 62 | Bethany Oprendek - bethany@bbo-enterprises.com |
Berlin-Barre Town | Berlin -Barre Town STP SURF (84) | Resurfacing of Vermont Route 63 | Bethany Oprendek - bethany@bbo-enterprises.com |
Bradford | IM 091-2(88)C/2 Bradford | Multiple bridge rehabilitations along I-91 in Bradford | Bethany Oprendek - bethany@bbo-enterprises.com |
Brattleboro | Brattleboro - Hinsdale, NH Bridge | NHDOT project - replaces the existing twin truss bridges on VT/NH 119 over the Connecticut River with a new structure | Bethany Oprendek - bethany@bbo-enterprises.com |
Brattleboro | Brattleboro I-91 Bridge Replacements | Rehabilitation of Bridges 4N&S located on I-91 at Exit #1 in Brattleboro crossing U.S. Route 5 (Canal Street). | Delia Makhetha - delia.makhetha@wsp.com |
Cambridge-Johnson | CAMBRIDGE-JOHNSON STP 2925(1) | Resurfacing along VT Route 15 in Cambridge and Johnson | Elaine Ezerins - Elaine.ezerins@wsp.com |
Colchester | COLCHESTER - HES NH 5600(14) | Installation of Vermont's first Diverging Diamond Interchange at I-89 Exit 16 in Colchester |
Exit 16 DDI Public Information Team |
Colchester | Colchester NH 028-1(31) | Improving the interchange at Exit 17 and the Chimney Corner intersection of U.S. Route 2 (U.S. 2) and U.S. Route 7 (U.S. 7) to enhance safety and mobility in Colchester. | Exit 17 Public Information Team info@ColchesterExit17.com |
Derby | DERBY IM 091-3(56) | Paving of I-91 in Derby to the Canadian Border | Bethany Oprendek - bethany@bbo-enterprises.com |
Fairfax-St. Albans | Paving on VT 104 from Fairfax MM 6.859 to St Albans Town MM 4.11, and the length of the St Albans State Highway. | Brandon Kipp brandon.kipp@vermont.gov |
|
Fairfield | Replace deck of Bridge No. 6 on VT-36 in Fairfield crossing the Fairfield River. | Stephanie Barrett - sbarrett@coibsinc.com | |
Fairlee |
Rehabilitation of Rock Cut #41 on I-91, in the southbound lane, at MM 92.55-92.60. |
Natalie Boyle - nboyle@eivtech.com | |
Grafton | GRAFTON BF 0125(6) | Replacement of bridge No. 20 on FAS Route 125 (Town Highway 1) over the Saxton River in Grafton | Elaine Ezerins - Elaine.ezerins@wsp.com |
Hartford | HARTFORD NH PS 249(3) | Resurfacing along US Route 5 in Hartford | Sophia Schintzel - Sophia.Schintzel@wsp.com |
Hartford | HARTFORD (QUECHEE) - NH 020-2(45) C/1 | Rehabilitation of the Quechee Gorge Bridge | Marcy Miller - mmiller@fhistudio.com |
Hartford | HARTFORD STP PS 24(2) | Resurfacing along US Route 5 in Hartford | Sophia Schintzel - Sophia.Schintzel@wsp.com |
Hartford | HARTFORD NHG SGNL(60) | This is a composite project with Hartford STP PS 24(2) and Hartford NH PS 24(3) | Sophia Schintzel - Sophia.Schintzel@wsp.com |
Hartford | BO 1444(60) Hartford | Replacement of Bridge 7 on TH-6 over the White River, including a new alignment | Sophia Schintzel - Sophia.Schintzel@wsp.com |
Ludlow Village | Replace existing truss bridge No. 57 on TH324 (Mill St.) in Ludlow Village with a pedestrian bridge | Delia Makhetha delia.makhetha@wsp.com |
|
Marshfield, Cabot, West Danville | Resurfacing along U.S. Route 2 from Marshfield to Danville | Sophia Schintzel - Sophia.Schintzel@wsp.com | |
Milton- St. Albans Town | A paving project on Interstate 89, from the bridge over the Lamoille River in Milton extending to Exit 19 in St. Albans Town, all lanes northbound and southbound. | Stephanie Barrett - sbarrett@coibsinc.com | |
Montpelier | Paving along U.S. Route 302 and U.S. Route 2 in Montpelier | Delia Makhetha - delia.makhetha@wsp.com | |
Montpelier | Paving along U.S. Route 2 beginning at Bailey Ave intersection in Montpelier on U.S. Route 2 progressing to the Berlin/Montpelier townline. | Delia Makhetha - delia.makhetha@wsp.com | |
Montpelier | MONTPELIER NH PS24(12) | Night paving Montpelier State Highway (Memorial Drive). | Bethany Oprendek - bethany@bbo-enterprises.com |
Northfield-Berlin | NORTHFIELD-BERLIN STP PS24(1) | Paving Vermont Route 12 from Northfield to the Berlin/Montpelier town line, along with Montpelier Junction State Highway (Dog River Road) and the Montpelier Park and Ride. | Bethany Oprendek - bethany@bbo-enterprises.com |
Pittsford | BF 019-3(59) |
Replace Bridge No. 108 on U.S. Route 7 in Pittsford, over Furnace Brook. |
Stephanie Barrett - sbarrett@coibsinc.com |
Poultney | Poultney BO 1443(53) | Replacement of Bridge No. 7 on TH-6 (On the Green) in Poultney over the Poultney River | Bethany Oprendek - bethany@bbo-enterprises.com |
Richmond | IM 089-2(52) Richmond | Replacement of Bridge No. 29 on U.S. route 2 in Richmond over I-89. | Stephanie Barrett - sbarrett@coibsinc.com |
Richmond - Bolton | STP 2924(1) Richmond | Resurfacing of U.S. Route 2 from Richmond to Bolton | Stephanie Barrett - sbarrett@coibsinc.com |
Royalton | BF 0147(29) Royalton | Replacement NECR bridge over VT Route 14 in Royalton, including a realignment of the roadway | Elisabeth Sundberg - esundberg@vhb.com |
Royalton | IM 089-1(63) | This bridge maintenance project addresses structural deficiencies and deterioration in the existing deck, superstructure, and substructure of the I-89 bridge over VT 107 near Exit 3. | Elisabeth Sundberg - esundberg@vhb.com |
Rutland City | RUTLAND CITY NH PC24(1) | Class 1 paving project on US Route 7, US Route 4, and US Business Route 4 | Annabelle Dally - Annabelle.dally@wsp.com |
Springfield-Hartland | SPRINGFIELD-HARTLAND IM SURF (68) | Resurfacing on I91 SB only from MM 41.4 to 66.47 including ramps. | Bethany Oprendek - bethany@bbo-enterprises.com |
Sunderland | BM20102 and NH CULV(122) | Construction on bridges #19-5 and #19-7, both on U.S. Route 7 in Sunderland | Elaine Ezerins - elaine.ezerins@wsp.com |
Westminster | WESTMINSTER - IM 091-1(70) | Replacement of decks and bearings on Bridges No. 21 North and South on I-91 over VT Route 121 in Westminster | Natalie Boyle - nboyle@eivtech.com |
Worcester | WORCESTER BF 0241(59) | Replacement of Bridge No. 84 on VT Route 12 over the North Branch of Winooski River | Sophia Schintzel - Sophia.Schintzel@wsp.com |