Skip to main content

Completed Research

Project Section Keyword Publication Year - Number Number Type
Advancing the Use of DWTR in Stormwater Treatment Features to Enhance Phosphorus Removal for Transportation Projects Environmental urban stormwater treatment; drinking water treatment residuals; phosphorus; phosphorus removal; sand filter; stormwater controls; BMPs 2025-01 01 Final
Vermont Smart Growth, Vehicle Miles Traveled, and Greenhouse Gas Research Planning Smart Growth, Vehicle Miles Traveled, Land Use Planning, Greenhouse Gas Emissions 2024-04 04 Final

Pavement Deterioration Models for Pavement Management: Final Report

Pavement Deterioration Models for Pavement Management: Appendix

Asset Management Pavement Management, Pavement Deterioration 2024-03 03 Final

Development of Cost-Effective Rapid-Setting Concrete for Improved Bridge Joint Performance

Materials Rapid Setting Concrete, Materials, Durability, Accelerated Bridge Construction 2024-02 02 Final
Vermont Agency of Transportation Research Program Communications Plan Research, Technology Transfer Research, Technology Transfer, Communications 2024-01 01 Final
Experimental Feature Work Plan 2018-R-3 Culvert Liners in Weathersfield and Woodford Experimental Feature Culvert, Spray-on Liner, Hydraulics 2023-05 05 Final

Radio-Frequency Identification (RFID) and Wireless Internet of Things (IoT) Technologies for Transportation Maintenance Operations and Asset Management

Asset Management Asset Management 2023-04 04 Final

Speeding Countermeasures Toolbox for Vermont

Speeding Countermeasures for Vermont: Final Report

Safety Speeding, Safety 2023-03 03 Final

Inter-Laboratory Study (ILS) of Bituminous Concrete Balanced Mix Design (BMD) Tests for Use on VTrans Projects

Materials Bituminous Concrete, Balanced Mix Design 2023-02 02 Final
Effectiveness of Rectangular Rapid Flashing Beacons (RRFBs) in Small and Rural Communities Highway Safety Bike/Ped, RRFBs 2023-01 01 Final
Value of VTrans Research: Qualitative and Quantitative Analysis Research Research, Valuation 2022-06 06 Final
Quantifying Correlations Between Pavement Conditions and Snow and Ice Control Costs Asset Management Snow & Ice Control, Pavement Conditions 2022-05 05 Final
Evaluation of Stripping Potential Tests for Bituminous Concrete Materials Asphalt Stripping, Binder 2022-04 04 Final

Dynamic Cone Penetrometer Analysis
Appendix B (Zip File of DCP Data)

Materials DCP, Geotechnical 2022-03 03 Final
VT AOT 2022 Research Peer Exchange Report Research Research, Peer Exchange 2022-02 02 Final
Tire Derived Aggregate for Underdrain Applications Experimental Feature TDA, Drainage 2022-01 01 Final
Quantifying Correlations Between Winter Severity, Road Conditions, and VTrans' Snow and Ice Control Activities Asset Management Snow and Ice Control, Storm Severity 2021-06 06 Final
Improving Roadway Conservation Investments in Vermont: Developing a Prioritization Screen Framework for Reducing Road Wildlife Mortality and Improving Wildlife Movement through Bridges and Culverts Environmental Wildlife Mortality, Wildlife Movement 2021-05 05 Final
Investigation of Full Depth Reclamation (FDR) on Cavendish-Weathersfield Road Materials Full Depth Reclamation, Cement Reclaim 2021-04 04 Final
Reclaimed Stabilized Base: Stabilizing Agent Selection and Design Materials Reclaimed Stabilized Base, Asphalt Emulsion 2021-03` 03 Final

Quantifying Gully Erosion and Potential for Sediment and Phosphorus Pollutions Reductions Achieved by Erosion Remediation Projects on Vermont's Roads  - Appendices

Environment Erosion Mitigation, Culvert, Gully 2021-02 02 Final
Hydraulic Inspection Vehicle Explorer (HIVE) Culvert Upgrade Maintenance Culvert, HIVE, Inspection 2021-01 01 Final
Recycled Asphalt Shingles (RAS) in Town Gravel Roads Recycled Materials RAS, Recycled Materials 2020-05 05 Final

Evaluating Effectiveness of Floodplain Sites along the Lamoille Valley Rail Trail: A Blueprint for Future Rail-River Projects - Appendices
 

Environment Floodplains, Erosion, Rail Trail 2020-04 04 Final
Radio Frequency Identification (RFID) Technology for Transportation Signage Management Asset Management Asset Management, Data Collection 2020-03 03 Final
Implementation of Intelligent Compaction (IC) for Pavement Construction in Vermont Pavement Paving, Compaction 2020-02 02 Final
Calibration of the Highway Safety Manual Predictive Models for Rural Two-lane Roads for Vermont Safety Highway Safety Manual, Rural Roads 2020-01 01 Final
Reducing Wildlife Mortality on Roads in Vermont: Determining Relationships Between Structure Attributes and Wildlife Movement Frequency Through Bridges and Culverts to Improve Related Conservation Investments Environment Road Ecology, Wildlife Passage, Wildlife Crossing 2019-15 15 Final
Quantifying the Vulnerability of Vermont Bridges to Seismic Loading Structures Seismic, Vulnerability, Hazard 2019-12 12 Final
Big-R-Bridge Super-Cor Buried Metal Structural Plate Arch and Vist-A-Wall Mechanically Stabilized Earth Retaining System: Construction and Settlement Report Structures, Geotechnical Mechanically Stabilized Earth, Arch, Retaining Wall, Structures 2019-11 11 Initial
Maintenance and Performance Study of Porous Asphalt in Northern Climates at the Randolph Park & Ride Environment, Pavement Porous Pavement, Stormwater 2019-10 10 Initial
Assessment of Poly-Carb FlexoGrid Bridge Deck Overlay System Structures Bridge Deck Overlay, Membrane, Skid Resistance 2019-09 9 Final
Snow and Ice Control Performance Measurement: Comparing “Grip,” Traffic Speed Distributions and Safety Outcomes During Winter Storms Maintenance Winter Maintenance, Performance measurement, Grip, Safety 2019-08 8 Final
Assessment of the BDM Waterproofing Membrane System Structures Spray Membrane 2019-07 7 Final
Recycled Asphalt Shingles in Town Gravel Roads Recycled Materials RAS, Recycle 2019-06 6 Initial
Concrete Pay Factors Analysis Materials Pay Factor, Concrete, QA/QC 2019-05 5 Final
Assessment of the HAWK Crosswalk Traffic Signal Safety Pedestrian, Traffic Signal, Safety, Crosswalk, Hybrid Beacon 2019-04 4 Final
Hamburg Wheel Tracker Preliminary Data Analysis Materials

Hamburg, Pavement, HMA, Asphalt, Pay Factor

2019-03 3 Final
Identifying Sensitive Structural and Hydraulic Parameters in a Bridge-Stream Network Under Flood Conditions Structures, Hydraulics 2D hydraulic modeling, Transient analysis, Extreme flood events, Bridge-river interactions, Bridge resiliency, Flood mitigation 2019-02 2 Final
Assessment of the Jahn Permeable Mortar System in a Historic Bridge Abutment Application Structures Historic Bridge Preservation, Stone Foundation, Abutment Repair, Covered Bridge, Masonry Mortar 2019-01 1 Final
Assessment of the Composite Arch Bridge Structures Composite Arch Bridge, Accelerated Bridge Construction, Structures 2018-08 8 Final
Assessment of Super-Slab, a Precast Concrete Bridge Approach Slab Structures Bridge Approach Slab, Precast Concrete 2018-07 7 Final
Assessment of the 40” Wide Paving Skid Box for Preventative Maintenance Pavements Preventative Maintenance, Paving, Rutting, Cracking 2018-06 6 Final
Pavement Marking Comparison Study - I-89 Liquid Markings Safety Pavement Markings, Utah Blend, Wet Reflective, Optics 2018-05 5 Final
Assessment of the Bridge Preservation LLC's BDM Waterproofing Membrane System Materials Membrane 2013 1 Update
2013 Pavement Marking Data Collection Summary Safety Pavement Marking 2013 6 Update
3M Stamark Polyurea, Liquid Pavement Marking Series 1200 in Grooved Pavement Surfaces, South Burlington, I-189  Safety Liquid Marking 2007   Final
3M Stamark Polyurea, Liquid Pavement Markings Series 1200 and 1000, Lyndon-Barton, I-91  Safety Liquid Marking 2007   Final
50-Gyration SuperPave Mix, Rochester-Granville, VT 100 Pavements SuperPave 2006   Initial
A Study of In Situ Pavement Material Properties Determined from FWD Testing Geotechnical FWD, Materials Properties 2004   Final
Acoustic Emission Monitoring of Prefabricated and Prestressed Reinforced Concrete Bridge Elements and Structures Structures Pre-stress Concrete, Acoustic Emissions, Quality Control 2018-02 2 Final
Activated Approach Flasher System Safety Activated Approach Flasher System 2009   Final
Aexcel Roadzilla (TM) Methyl Methacrylate Pavement Marking Safety Liquid Marking 2014-15 15 Final
Alternative Pavement Designs - Randolph Park and Ride Environment, Pavement Permeable Pavement, Stormwater 2012 5 Initial
Alternative Pavement Designs - Randolph Park and Ride Environment, Pavement Permeable Pavement, Stormwater 2013   Update
An Evaluation of Brifen Wire Rope Safety Fence  Safety Safety Fence 2013   Final
An Evaluation of Dilemma Zone Protection Practices for Signalized Intersection Control published by UMass-Amherst Traffic Signalized Intersection Safety 2009   Final
An Evaluation of TYFO S Fibrwrap Structures Fibrwrap 2013-05 5 Final
An Investigation into Porous Concrete Pavements for Northern Communities  Pavements, Environment Permeable Pavement, Stormwater 2010   Final
Asphalt Treated Permeable Base Pavements Permeable Base 2013 9 Update
Assessment of 40” Wide Paving Skid Box Pavements Paving Skid Box 2013 5 Update
Assessment of ASTM D 6690-12 Type II of Type IV Joint Sealers Pavements Joint Sealers 2014 8 Update
Assessment of Bridge Preservation LLC’s BDM Waterproofing Membrane System  Materials Membrane 2017 3 Update
Assessment of Bridge Preservation LLC’s BDM Waterproofing Membrane System  Materials Membrane 2016 3 Update
Assessment of Design Parameters and Construction Requirements for Full Depth Reclamation Projects with Cement Construction Full Depth Reclamation 2015-05 5 Final
Assessment of Detectable Warning Products Safety Detectable Warning Products 2013 3 Update
Assessment of Fiber Reinforced Polymer (FRP) Strips for Bridge Rehabilitation  Structures Bridge Rehabilitation, Fiber Reinforced Polymer 2017 9 Update
Assessment of Jahn Permeable Mortar System in a Historic Bridge Abutment Application Structures Permeable Mortar 2015 10 Initial
Assessment of Mechanically Fastened Fiber Reinforced Polymer (MF-FRP) Strips for Extending Bridge Service Life Structures Fiber Reinforced Polymer 2015 8 Initial
Assessment of Poly-Carb Mark-163 Flexogrid Bridge Deck Overlay System  Materials Bridge Deck Overlay 2017 4 Update
Assessment of Super-Slab, a Precast Concrete Slab in a Bridge Approach Application Materials Super-Slab, Bridge Approach 2017 7 Update
Assessment of TechCrete a Concrete Repair Material and Joint Sealant Pavements Concrete Repair, Joint Sealant 2013 11 Update
Assessment of the Composite Arch "Bridge in a Backpack" bridge system from Advanced Infrastructure Technologies (AIT) Structures Composite Arch Bridge 2014 12 Initial
Assessment of the Jahn Permeable Mortar System In a Historic Bridge Abutment Application Structures Permeable Mortar 2017 5 Update
Assessment of the Pedestrian Hybrid Beacon Crosswalk System (PHB) or High-Intensity Activated Crosswalk (HAWK) System  Safety Crosswalk 2017 8 Update
Assessment of the Poly-Carb Flexogrid Bridge Deck Overlay System Materials Bridge Deck Overlay 2013 2 Update
Assessment of the Stirling Lloyd Eliminator Waterproofing Membrane System  Materials Membrane 2017 6 Update
Assessment of Uretek Deep Injection Process Geotechnical Deep Injection Process 2015 9 Update
BASphalt, Hot Mix Asphalt for Patching and Cross-Ditch Patching  Materials BASphalt, Patching 2006   Final
Berlin 2947(1) Pavement Marking Study US 302 Bike Lane Installations  Safety Bike Lane, Tape Markings 2016 1 Update
Berlin 2947(1) Pavement Marking Study US 302 Initial Winter Season Inspection on the Bike Lane  Safety Bike Lane, Tape Markings 2016 2 Update
Brifen Wire Rope Safety Fence Safety Safety Fence 2006   Initial
Cargill SafeLane® HDX Overlay Pavements Anti-Ice Overlay 2014 4 Update
Centerline Rumble Stripes - Cambridge, Vermont Safety Rumble Stripes 2014 3 Update
Changing Risk of Extreme Event Impacts on Vermont Transportation Infrastructure  Structures Extereme Event Impacts 2017   Final
Cold in-Place Recycled Bituminous Pavement - Dorset - Danby Pavements Asphalt, Cold in-Place Recycle 2015 4 Update
Cold Weather Waterborne Paint with XSR  Safety Liquid Marking 2007   Final
Cold Weather Waterborne Paint with XSR  Safety Liquid Marking 2006   Initial
Cold-Recycled Bituminous Pavement, Chester-Springfield, VT 11  Pavements Asphalt, Cold in-Place Recycle 2007   Final
Cold-Recycled Bituminous Pavement, Derby-Charleston, VT 105  Pavements Asphalt, Cold in-Place Recycle 2007   Final
Cold-Recycled Bituminous Pavement, Troy-Newport, VT 105 Pavements Asphalt, Cold in-Place Recycle 2007   Final
Cost-Effective and Rapid Concrete Repair Techniques Operations and Maintenance Rapid Concrete Repair 2017   Final
Designing the All-in-One Vermont Transportation Survey  Policy and Planning Transporation Survey 2017   Final
Detectable Warning Panel Evaluation  Materials Warning Panel 2006   Final
Detection and Mitigation of Subsidence and Voids on Vermont Roadways: I-89 Hartford and US 7 Manchester, Vermont  Geotechnical Subsidence, Voids 2008   Final
Development and Implementation of Early Detection Systems for Ground Movement Geotechnical Ground Movement 2008   Final
Dynamic Striping in Four Towns along Vermont Route 30  Traffic Dynamic Striping 2007   Final
Dynamic Striping in Four Towns along Vermont Route 30  Traffic Dynamic Striping 2005   Initial
Effects of Highway Road Salting on the Water Quality of Selected Streams in Chittenden County, Vermont Environment Water Quality 2010   Final
Efficiency in Transportation - Community and State Transportation Efficiency Planning in Vermont  Policy and Planning Transportation Efficency 2012-03 3 Final
Efficiency in Transportation - Increasing Carpooling in Vermont Alternatives to Single Occupancy Vehicle Policy and Planning Transporation Efficency 2012-02 2 Final
Efficiency in Transportation - Optimal Transit Networks For Vermont  Policy and Planning Transporation Efficency 2012-01 1 Final
Employee Retention and Knowledge Management Study Administration Workforce, Retention 2018-01 1 Final
Ennis Paint, Inc. Tyregrip High Friction Surface System Safety High Friction Surface System 2014 2 Update
Epoplex Glomarc 90 Polyurea Pavement Marking Safety Liquid Marking 2015-02 2 Final
Epoplex Glomarc 90 Polyurea Pavement Marking – Initial Safety Liquid Marking 2014 6 Initial
Epoplex LS 90 Polyurea Pavement Marking  Safety Liquid Marking 2007   Final
Evaluation and Comparison of Epoplex LS-50 Epoxy, Lyndon/Sheffield, I-91 Safety Liquid Marking 2007   Final
Evaluation and Comparison of Snowplowable Raised Pavement Markings (SRPM), Waterbury-Bolton, I-89  Safety Liquid Marking 2007   Final
Evaluation of 3M Stamark High Performance Wet Reflective Tape Series 380W ES Durable Tape  Safety Tape Marking 2011-02 2 Final
Evaluation of 3M(tm) Stamark All Weather Liquid Pavement Marking Series 1400  Safety Liquid Marking 2012   Final
Evaluation of ATM 300 Permanent Durable Tape Safety Tape Marking 2007   Initial
Evaluation of ATM 300 Permanent Durable Tape  Safety Tape Marking 2010   Final
Evaluation of ATM 400 Permanent Durable Tape  Safety Tape Marking 2010   Final
Evaluation of ATM 400 Permanent Durable Tape  Safety Tape Marking 2007   Initial
Evaluation of BlinkerSign Crosswalk Lighting System Safety Crosswalk 2014 13 Update
Evaluation of Bridge Performance and Rating through Non-Destructive Load Testing  Structures Bridge Performance 2009   Final
Evaluation of Concrete Bridge Mix Designs for Control of Cracking, Phase I Structures Concrete Bridge Mix Design 2014-09 9 Final
Evaluation of Concrete Bridge Rail Cracking  Structures Concrete Bridge  2009   Initial
Evaluation of Corrosion Resistance of Various Concrete Reinforcing Materials Structures Corrosion Resistance 2013-07 7 Final
Evaluation of Crown Technology’s Tuffline Hydrocarbon Thermoplastic Safety Hydrocarbon Thermnoplastic 2005   Update
Evaluation of Hybrid Rockfall Barrier/Drape System  Geotechnical Hybrid Rockfall Barrier/Drape System 2011   Initial
Evaluation of Load Characteristics of I-89 Bridge 58N, Richmond  Structures Bridge Load Characteristics 2015   Final
Evaluation of Measuring Methods for Traffic Sign Retroreflectivity  Safety Traffic Sign Retroreflectivity 2009   Final
Evaluation of SmartStudTM In-Pavement Crosswalk Lighting System and Blinkersign®  Safety Crosswalk 2011   Update
Evaluation of SPT Hammer Energy Variability Geotechnical Hammer Energy  2010   Final
Evaluation of the Effectiveness of Centerline Rumble Stripes on Rural Roads Safety Rumble Stripes 2015 7 Update
Evaluation of Ultra Hydrophast with Rhoplex Fastrack HD-21A Safety Liquid Marking 2007   Initial
Evaluation of Ultra Hydrophast with Rhoplex Fastrack HD-21A  Safety Liquid Marking 2009   Final
Evaluation of Ultraliner PVC Alloy Pipeliner Structures Culvert Lining 2013 13 Update
Examining the Potential Impacts of Maintenance Investment and Capital Reinvestment In Vermont’s Roadway Infrastructure Network Policy and Planning Mainintenance Investment, Capital Reinvestment 2017   Final
Exploring Transportation Behaviors and Needs of Veterans and People with Physical Disabilities and Mobility Constraints  Transit Transporation Behaviors 2017   Final
Forest Dale Masonry Wall and Slide Repair with Soil Nails and Rock Dowels  Geotechnical Masonry Wall and Slide Repair 2003   Final
Foster Geotechnical Retained-Earth, Mechanically-Stabilized Abutment Wall  Geotechnical Retaining Wall 2004   Initial
Full-Scale Pilot Study to Reduce Lateral Stresses in Retaining Structures Using GeoFoam published by UMass-Amherst  Geotechnical Retaining Structures 2009   Final 
Galvashield XP Sacrificial Anodes  Structures Sacrificial Anodes 2003   Initial
GlasGrid Pavement Reinforcement System, Charleston and Barnet, Vermont  Pavements Pavement Reinforcement 2008   Final
Gyration SuperPave Rochester-Granville Pavements SuperPave 2014 2 Update
Harvesting Data from Advanced Technologies Traffic Advanced Technologies 2014-11 11 Final
High Speed Ground Penetrating Radar for Road Pavement and Bridge Structural Inspection and Maintenance  Operations and Maintenance Ground Penetraining Radar 2016   Final
Identifying Performance Based Measures for Winter Maintenance  Operations and Maintenance Winter Maintenance 2013   Update
Impacts of Studded Tires on Pavement and Associated Socioeconomics Policy and Planning Studded Tires 2011   Final
Improving Transportation Mobility, Safety, and Efficiency: Guidelines for Planning and Deploying Traffic Signal Priority Strategies published by UMass-Amherst Transit Transporation Mobility 2008   Final
Insituform Pipe Lining Process, Richmond, Bridport, and Addison  Structures Pipe Lining 2007   Final
Investigation of Alkali-Silica Reactivity in Portland Cement Concrete Materials Concrete, ASR 2003    
Investigation of Alkali-Silica Reactivity in Portland Cement Concrete Materials Concrete, ASR 2008   Final
Investigation of the Local Hydrology of a Porous Concrete Site Pavements Permeable Pavement, Stormwater 2013 10 Update
Laboratory and Field Evaluations of Pervious Concrete Pavements Permeable Pavement, Stormwater 2013-14 14 Final
Laboratory Freeze-thaw Durability of Pervious Concrete with Respect to Curing Time and Addition of Sand, Slag, Silica Fume, and Saltguard Pavements Permeable Pavement, Stormwater 2017   Final
Long-Term & Short-Term Measures of Roadway Snow and Ice Control Performance  Operations and Maintenance Snow and Ice 2016   Final
Muddy Roads  Geotechnical Muddy Roads 2005   Final
Non-Nuclear Compaction Gauge Comparison Study  Geotechnical Compaction Gauge 2008   Final
Optimization of Snow Removal in Vermont Operations and Maintenance Snow Removal 2013 12 Update
Passenger Vehicle Idling in Vermont - Year 1 Report Policy and Planning Vehicle Idling 2013 8 Update
Pavement Condition Study Policy and Planning Public Feedback, Pavement Condition, Data Collection App, Public Outreach Survey Methods, Performance Measures, Performance Management, Customer Service 2018-04 4 Final
Pavement and Annualized Cost Study, Statewide Pavements Pavement Cost 2010   Update
Pavement Marking Durability Safety Pavement Marking 2005   Update
Pavement Marking Comparison Study - US Route 302 Bike Lane Markings Safety Pavement Marking 2018-03 3 Final
Pavement Marking Durability – Statewide  Safety Pavement Marking 2007   Final
PavePrep Crack Reduction Interlayer, Lowell, Highgate and Hartford, Vermont  Pavements PavePrep 2008   Final
Pedestrian Hybrid Beacon Crosswalk System (PHB) or High-Intensity Activated Crosswalk (HAWK) Structures Crosswalk 2014 10 Update
Performance Grade Asphalt Cement  Pavements Asphalt 2006   Final
Performance Monitoring of Jointless Bridges – Phase III Structures Jointless Bridges 2014-07 7 Final
Performance Monitoring of Jointless Bridges – Phase III Structures Jointless Bridges 2011   Update
Performance of Brookfield RAS Surface Aggregate Blend  Pavements Recycled Materials, RAS 2017 1 Update
Permeability of Highway Base and Sub-base Material  Geotechnical Permeable Base 1997   Final
Prediction and Mitigation of Scour and Scour Damage to Vermont Bridges  Structures Scour 2017   Final
Preventative Maintenance Treatments  Pavements Preventative Maintenance 2017-01 1 Final
Quantification of Shape, Angularity, and Surface Texture of Base Course Materials  Materials Aggregate 1998   Initial
Recessed and Surface-Applied Polyurea Pavement Markings Safety Pavement Marking 2005   Update
Reclaimed Base Course Stabilized with Calcium Chloride, Brandon-Goshen, VT Route 73 Pavements Reclaimed Stabilized Base 2008   Final
Reclaimed Stabilized Base with Cement, Moretown-Duxbury, VT Route 100  Pavements Reclaimed Stabilized Base 2009   Update
ReCon Mechanical Stabilized Earth Retaining Wall System  Geotechnical Retaining Wall 2015   Initial
Redi-Rock Retaining Wall System Geotechnical Retaining Wall 2006   Final
Redi-Rock Retaining Wall System with Geogrid Geotechnical Retaining Wall 2007   Final
Reducing Emissions from Diesel Vehicles and Equipment: A VTrans Demonstration  Environment Diesel Emissions 2008   Final
Reinforced Earth® Mechanically-Stabilized Earth Abutment Walls, US7, Wallingford Geotechnical Retaining Wall 1998   Initial
Renegotiation of Highway Construction Contracts: An Economic Analysis of Change Orders issued by the Vermont Agency of Transportation, 2004-2009 Policy and Planning Construction Contracts 2013   Update
Rockfall Hazard Rating of Rock Cuts on U.S. and State Highways in Vermont  Geotechnical Rockfall 2007   Final
Salt Brine Salt Brine Blends and Application Technologies During The 2008 - 2009 Winter Maintenance Season  Operations and Maintenance Winter Maintenance 2009   Final
Shared Use Path Barrier Usage Guideline published by UMass Dartmouth Safety Path Barrier 2007   Final
Shared Use Path Fencing Usage published by UMass Dartmouth Safety Path Fencing 2007   Final
SmartStud In-Pavement Crosswalk Lighting System Safety Crosswalk 2006   Initial
Snowplowable Raised Pavement Markings Safety Pavement Marking 2006   Update
Statewide Analysis of Guardrails, Curves and Crashes Published by The University of Vermont Safety Guardrails 2016   Final
Statistical Analysis of Weigh-in-Motion Data for Bridge Design in Vermont Structures Weigh-in-Motion 2014-14 14 Final
Stormwater Practices Research Project  Environment Stormwater 2012   Final
Strategic Location of Satellite Salt Storage for Roadway Snow and Ice Control in Vermont Operations and Maintenance Snow and Ice 2015 1 Update
Study of In Situ Pavement Material Properties Determined from FWD Testing Pavements Pavement Material Properties 2004   Final
Suitability of Intelligent Compaction for Relatively Smaller-Scale Projects in Vermont Construction Intellegent Compaction 2017   Final
Synthesis of Technical Information for Jointless Bridge Construction Structures Jointless Bridges 2002   Update
Tensar Mesa Retaining Wall System  Geotechnical Retaining Wall 2006   Final
Terminal Blend Asphalt Rubber Hot Mix Lowell-Westfield, VT Route 100  Pavements Asphalt 2008   Final
The Effect of Aggregate Angularity on Base Course Performance  Materials Base Course 2001   Update
Thermal-Imaging of Applied Bituminous Pavement Statewide Projects  Pavements Bituminous Pavement 2006   Update
Travel Importance and Strategic Investment in Vermont’s Transportation Assets Policy and Planning Transportation Assets 2014-01 1 Final
Using Remote Data Collection to Identify Bridges and Culverts Susceptible to Blockage During Flooding Events  Operations and Maintenance Remote Data Collection 2016   Final
Utilization of Ground Penetrating Radar (GPR) to Detect Shear Bolts in Bridges  Operations and Maintenance Ground Penetraining Radar 2017 2 Update
Verification of Abutment and Retaining Wall Design Assumptions Geotechnical, Structures Retaining Wall 2015-06 6 Final
Vermont Trip Generation Manual  Traffic Trip Generation Manual 2010   Final
Wavetronix Smart Sensor Matrix Safety Wavetronix, Radar Sensor 2015-13 13 Final
Wavetronix SmartSensor Matrix Radar Stop Bar Detection Safety Wavetronix, Radar Sensor 2013 4 Update
Westfall Fiberglass Bridge Drain Pipe System, South Burlington, I-89  Structures Fiberglass Drain 2007   Initial
Westfall Fiberglass Bridge Drain System Structures Fiberglass Drain 2013   Final
Work Zones and Travel Speeds Construction Work Zone 2014-05 5

Final