- Design, Bid, Build (Traditional Bid Process)
- CMGC – Construction Manager General Contractor
- Design – Build
- Design, Build, Own, Operate and Maintain
- Contractor Input During Design
Design, Bid, Build (Traditional Bid Process)
Click here for Historical Data
Bids received will be posted to this location as soon as possible after the 11:00 am Bid Opening.
Detail Bid result report will be posted after preliminary review when more than one Bid is received.
If only One Bid received, the Low Bid Contractor Name and Bid Amount will be posted in this location.
Full details will be posted when Contract is Awarded.
Contract Number
|
Construction contract |
Bid Opening |
DETAIL BID RESULTS |
Award date Awarded contractor |
Executed date |
---|---|---|---|---|---|
C03218 | ESSEX-FAIRFAX STP FPAV (85) | 3/21/25 | Detail Bid Report | TBD | TBD |
C03220 | BRATTLEBORO NH PC25 (5) & BRATTLEBORO STP PC25 (6) & BRATTLEBORO-PUTNEY STP PS25 (11) | 3/14/25 | Detail Bid Report | TBD | TBD |
C03217 | THETFORD-FAIRLEE STP FPAV (64) | 3/7/25 | Detail Bid Report | TBD | TBD |
C03215 | SHELDON-ENOSBURG STP FPAV(68) | 3/7/25 | Detail Bid Report | TBD | TBD |
C03214 | WOLCOTT BO 1446 (38) | 2/28/25 | Detail Bid Report |
3/20/25 CCS Constructors, Inc. |
3/24/25 |
CO3186 | BENNINGTON BF 1000 (20) (RE-AD) | 2/28/25 | Detail Bid Report | TBD | TBD |
C03174 | CHESTER GMRC (25) (RE-AD) | 2/21/25 | Detail Bid Report |
3/13/25 Engineers Construction, Inc. |
3/18/25 |
C03212 | WOODSTOCK BF 0166 (12) | 2/21/25 | Detail Bid Report |
3/20/25 Winterset, Inc. |
3/21/25 |
C03213 | CHELSEA-WASHINGTON STP FPAV (70) | 2/7/25 | Detail Bid Report |
2/19/25 Pike Industries, Inc. |
2/27/25 |
C03210 | SHARON CMG PARK (51) | 1/31/25 | Detail Bid Report |
2/27/25 Bazin Brothers Trucking, Inc. |
3/10/25 |
C03211 | PLYMOUTH ER P23-1 (317) | 1/17/25 | Detail Bid Report |
2/10/25 Cold River Bridges, LLC |
2/13/25 |
C03208 | WATERFORD IM 093-1 (14) | 1/17/25 | Detail Bid Report |
2/10/25 Five Starr Construction, LLC |
3/11/25 |
C03099 | SPRINGFIELD BF 0134 (49) (RE-AD) | 12/20/24 | Detail Bid Report |
1/9/25 Kubricky-Jointa Lime LLC |
1/21/25 |
C03209 | LOWELL STP CULV (65) | 12/13/24 | Detail Bid Report |
1/9/25 J. A. McDonald, Inc.
|
1/21/25 |
C03163 | BARRE TOWN-ORANGE STP PS23 (1) & ORANGE-TOPSHAM STP FPAV (56) | 12/13/24 | Detail Bid Report |
1/10/25 J. Hutchins, Inc. |
1/29/25 |
C03195 | ST. ALBANS-RICHFORD STP MVRT (1)(RE-AD) | 11/15/24 | Detail Bid Report |
12/9/24 S. D. Ireland Brothers Corporation |
1/2/25 |
CMGC – Construction Manager General Contractor
Construction contract |
Contractor |
Award Amount |
Award Date |
Executed date |
---|---|---|---|---|
TBD | TBD |
TBD |
TBD |
Design – Build/ Progressive Design Build
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Lyndon IM091-3(53) PDB- RFP | S.D Ireland Concrete Construction Corporation | $21,300,000 | 03/20/2025 |
Lyndon IM091-3(53)- DB- RFP | Cancelled 1.18.2024 | Cancelled- 1.18.2024 | Cancelled-1.18.2024 |
Lyndon IM91-3(53)- DB- RFQ |
Engineers Construction, INC. J.A McDonald Inc. |
N/A | 12/22/2022 |
Design, Build, Own, Operate and Maintain
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Statewide National Electric Vehicle Infrastructure (NEVI) RFP | Award Notification | Please see award notification | Please see award notification |
Statewide National Electric Vehicle Infrastructure (NEVI)_ RFQ | Shortlist Notification | N/A | 06/05/2024 |
Contractor Input During Design
Construction Contract | Contractor | Award Amount | Award Date |
---|---|---|---|
Chester BO 1442(39) | Shortlist Notification | N/A | 05/08/2024 |